Is Home Renovation in Singapore Considered Construction Work?

May 2, 2024

Home renovation and construction projects can substantially alter our living spaces by enhancing their functionality and aesthetics in ways we have dreamed of. However, we must be aware that when it comes to alterations and construction of homes in Singapore, such works also delve into a complex realm where individual creativity demands to be met with meticulous urban planning. Our nation's strict regulatory environment ensures that even small renovation projects align with broader national goals of safety, sustainability, and community well-being. On top of that, understanding these regulations becomes even more crucial as Singapore’s real estate market continues to grow, with projections indicating substantial increases in market size over the coming years.

Every square meter of renovated space must be thoughtfully planned to contribute positively to the urban tapestry of our nation and reflect Singapore’s commitment to meticulous urban management and high living standards. These activities must also intersect with stringent regulations set forth by the National Environment Agency (NEA) to ensure safety, minimise environmental impact, and comply with local laws. For this reason, understanding whether a home improvement is considered construction work is crucial, as it can significantly affect project planning, compliance with regulatory standards, sustainable practices, and legal and efficient execution. This classification also triggers some requirements and guidelines that we must follow to avoid hefty fines and potential disruptions. So, let’s get at it.

Understanding the Differences Between Minor Home Renovation and Construction Work in Singapore

The distinction between minor home renovation and construction work in Singapore is significant due to the regulatory frameworks set by agencies like the Building and Construction Authority (BCA) and the Housing & Development Board (HDB). Minor renovation works in Singapore that do not affect the building's structural integrity to a great extent may be exempt from rigorous regulatory requirements. Even so, they require compliance with specific guidelines.  For instance, some small renovations in private landed properties do not require plan submissions if they do not affect the building's structural elements or encroach on public land. These exemptions are designed to simplify the renovation process for less impactful projects. In short, home renovations are still regulated, but they usually deal with less stringent controls, unless they involve significant structural changes.  

In contrast, in the context of BCA regulations, construction works and other significant renovation works for private homes—landed houses, apartment buildings, condominiums, cluster housing, and residential units in a mixed development—that involve building or demolition processes and can affect a building's structural integrity and significantly impact the surrounding environment need to adhere to the Building Control Act and Regulations, which govern the structural safety and environmental sustainability of buildings. These activities are heavily regulated due to their potential to significantly impact public health, safety, and the environment. Hence, such works also need approval from BCA.

For renovations in condominiums, obtaining approval from the condominium management and engaging a licensed renovation contractor are essential steps that ensure compliance with both building codes and condominium by-laws. If renovations involve structural changes, a BCA permit is required​.

When it comes to HDB flats, most small interior renovation works do not typically need us to submit plans to the BCA. The BCA is primarily concerned with larger-scale structural and civil engineering projects that affect the overall building structure and safety. However, HDB flat renovations that involve structural changes or certain types of special installations that could affect the building’s integrity might require a review or approval from the BCA. This usually includes work like alterations to structural elements like removal of load-bearing walls, and major changes to sanitary, plumbing, or electrical systems that could impact the building structure or require integration with public utilities.

For non-structural renovations within HDB flats, such as replacing floor tiles, kitchen renovations, or updating bathroom fixtures, we typically need to seek approval from HDB itself. HDB provides clear guidelines on the permissible types of renovations and the approval process.  It is a good practice to consult with a qualified professional such as a registered professional engineer who can advise on whether BCA approval is needed and help with the submission process if necessary if we are planning renovations that might involve major structural changes or significant modifications to systems like lift and escalators, fire safety, mechanical and electrical systems, that are regulated by BCA. We also need to engage a contractor listed in the Directory of Renovation Contractors (DRC) for all renovations in HDB flats.  

Asia's largest online property portal group PropertyGuru talks about the 9 renovation permits and guidelines we need during HDB renovations.  


Prerequisites for Major Renovation and Construction Projects in Singapore

Understanding the regulatory landscape for renovation and construction projects in Singapore is crucial. So, here we are with a section outlining the critical prerequisites set by BCA to ensure that such projects meet both legal and community standards.

Construction Permits and Detailed Site Plans: The BCA provides guidelines on the necessity of permits for all building works except for minor ones, as detailed in the Building Control Regulations. This includes the requirements for structural plan approval and permits before any work can start. Permits are crucial to ensure that all proposed construction work complies with local regulations and building codes.

Submission of Building Plans

The BCA requires that the building plans be submitted through a detailed and systematic process. These plans must clearly outline all aspects of the construction project, including environmental protection measures and the expected community impact.  

Monitoring and Regulation

The duration of every major renovation or construction project in Singapore is subject to rigorous monitoring and regulation. This includes regular site inspections to ensure compliance with the approved plans and to maintain safety standards on the construction site. Inspections are crucial for identifying and mitigating potential safety hazards.  

Environmental and Community Considerations

Singapore also strongly emphasises environmental protection and minimising the impact of construction on the community. This involves careful planning and execution of construction activities to adhere to environmental sustainability regulations established under the Building Control (Environmental Sustainability) Regulations 2008. These regulations require that construction projects contribute positively to the sustainability of the built environment. Workplace Safety and Health (Construction) Regulations also require such projects to comply with immediate safety and quality requirements and specific safety regulations to protect workers and the public from construction-related hazards.

Process of Applying and Approval for Major Renovation and Construction Works in Singapore

The life cycle of approval for renovation and construction works in Singapore involves a systematic and sequential process — it starts from the preparation of plans by the Qualified Person (QP) to the final permit issuance by the BCA. A QP is usually a registered architect or a registered civil or structural engineer who is legally authorised to prepare and submit building plans for statutory approval. They will be responsible for ensuring that the design of the building complies with the Building Control Act and Regulations. They also play a crucial role in the planning and construction process, overseeing the project from its inception to completion.


Key stages of application and construction include:

Preparation and Lodgement: The QP prepares, and lodges plans of building works with the BCA for initial review.

Consultation and Submission: The QP consults with BCA and Technical Departments (TDs) for specific requirements and obtains necessary clearances.  

A Detailed Overview of the Application Depending on the type of project:

This process ensures that all technical requirements are met before, during, and after the construction. The BCA’s e-submission system is typically used for this purpose, and it ensures efficient management and review of construction documents.


We also need to remember that it is crucial for us to work with contractors who are experienced in navigating Singapore’s regulatory environment and who can ensure that all aspects of our renovation comply with local guidelines. The Professional Engineer’s Board provides a directory of professional engineers with practising certificates to make the process easier for us.  

Permits and Approvals: After BCA approves the plans, the QP must obtain permits to carry out structural work from the BCA before the commencement of any construction. Application for this permit must be jointly made by the building owner or developer, the QP responsible for the supervision of the building works, and the builder who will carry out the building works. The Commissioner of Building Control is responsible for issuing the permit and may include specific terms or conditions for the applicant, builder and QP involved.

Progress Reporting: The QP is responsible for submitting progress reports to the BCA to ensure that the work aligns with the approved plans.

Completion and Certification: Upon completion of the works, the QP applies for a Temporary Occupation Permit (TOP) or Certificate of Statutory Completion (CSC) from the BCA, marking the project's compliance with all stipulated regulations and its readiness for occupation.


Crucial NEA Guidelines on Minor Home Renovations in Singapore

The National Environment Agency regulates home renovation activities, which may encompass tasks such as repainting, carpentry, and updating fixtures. These activities, while minor, are scrutinised when they potentially impact the surrounding environment, especially concerning noise pollution and waste management.

Noise Control Measures

NEA enforces strict guidelines to mitigate noise from construction and renovation activities near residential areas. Construction noise levels are restricted to not exceed 75 dBA (Leq 12 hrs) during the daytime. These restrictions are more stringent at night to reduce the impact on residents. In addition to this, NEA imposes a no-work rule on Sundays and public holidays for all renovation activities near residences, irrespective of their scale. This ensures that residents enjoy peace on their off days, which is crucial in Singapore's dense residential settings.

Environmental Impact and Dust Control

NEA mandates measures to minimise environmental disruptions for renovations that are not categorised as construction work. The Green and Gracious Builder Guide includes implementing dust control strategies such as water sprays and scheduling noise-intensive tasks within restricted hours to minimise disturbances.

Waste Management Practices

The NEA mandates responsible management and disposal of all renovation debris. Contractors must utilise licensed waste disposal services and follow strict guidelines to ensure that all waste materials are handled in an environmentally safe manner. This includes the segregation of waste types and the use of proper disposal methods to prevent illegal dumping and other practices that could harm the environment.

Regulation of Hazardous Chemicals

The NEA closely regulates the use of hazardous chemicals during renovation projects to avoid environmental contamination. Contractors and homeowners are required to ensure that all chemicals used follow NEA’s stringent chemical safety standards. This includes obtaining the necessary approvals for chemical use and ensuring proper storage and handling to mitigate risks to both health and the environment.

Air Quality Protection

To further safeguard the environment and public health during renovation projects, NEA also enforces air pollution regulations aimed at maintaining air quality. This involves monitoring the release of volatile organic compounds (VOCs) and other pollutants to ensure they remain within safe limits. Renovation projects must adopt practices that reduce air emissions, such as choosing low-VOC paints and materials.

Compliance and Enforcement by NEA

We have discussed strict environmental standards extensively. But do we know what happens if we don’t comply with the rules and regulations? This section outlines how the NEA conducts inspections, uses monitoring technologies, and enforces regulations to protect public health and the environment.

Regular Inspections: NEA conducts routine inspections of renovation sites to ensure that all activities comply with environmental regulations. These inspections are aimed at verifying adherence to noise, dust, mosquito control, and waste management guidelines, as well as the proper use of chemicals and adherence to air quality standards.

Monitoring Techniques: NEA ensures that the construction aligns with approved plans and maintains high safety and quality standards throughout the project. The agency utilises various monitoring techniques including the use of Class 1 noise meters, air quality sensors, and visual inspections to assess compliance. NEA may also employ remote monitoring technologies to oversee critical parameters at renovation sites continuously.

Enforcement Actions: NEA has the authority to take immediate enforcement actions when non-compliance is detected. These can range from issuing warnings and imposing fines to more severe penalties such as issuing stop-work orders. In cases where violations have significant environmental or health impacts or when there is repeated non-compliance, criminal charges may be pursued against the violators.

Penalty Structure: Penalties are often structured to reflect the severity and frequency of the violations. Fines can vary widely depending on the specific nature of the non-compliance. For instance, failure to comply with dust control measures might result in a different penalty compared to violating hazardous chemical regulations.

Appeals and Disputes: Contractors and homeowners have the right to appeal against any enforcement action. NEA provides a process for handling construction-related disputes or appeals, where the involved parties can present their case. This ensures fairness and allows for a review of the enforcement actions taken.

Educational and Support Programs: Recognising the importance of compliance, NEA also offers educational and support programs for contractors and homeowners. These programs aim to provide a better understanding of the regulations and promote best practices in renovation activities. Workshops, seminars, and online resources are common tools used by NEA to disseminate information and encourage compliance.

Sendhelper for Home Renovations in Singapore

Understanding whether our home renovation qualifies as construction work under NEA guidelines is more than a bureaucratic necessity—it is an essential part of responsible homeownership in Singapore. We as homeowners need to adhere to these guidelines to ensure their renovations are safe, environmentally friendly, and legally compliant and contribute to a better and more sustainable living environment. Consult directly with NEA or legal and construction professionals who can provide further information, specific advice, and tailored guidance based on the project's specifics.  

You can also entrust the renovation task with Sendelper, Singapore's top home servicing brand. Sendhelper’s trained professionals will guide you through the best practices and regulations. They are also equipped with necessary skills and certifications to complete renovation projects to your satisfaction.